The test machine is a high-precision detection instrument. Customers who purchase it in another place are worried about transportation problems on the way. Therefore, any mistakes during transportation and installation may affect the entire test results. For this reason, our company has summarized the following 7 points:
1. The hydraulic system should be installed safely with pressure conditioning.
2. Parts and components that may be loose during operation of the test machine should be equipped with anti-loosening installation.
3. Safe installation and limit installation should be flexible and reliable.
4. The test machine or parts and components with larger weight should be easy to lift and install, and should be equipped with lifting holes or lifting rings.
5. The exposed sliding parts, gears, pulleys, etc. of the test machine should be protected and installed.
6. When requesting the motor to rotate in both directions, the arrows in the direction of movement should be marked outside the appropriate part.
7. There should be good grounding installation on the electrical box of the base of the test machine. The grounding installation position should be convenient for wiring and have the word "grounding" or grounding mark.
More technical information of test machines are available at Jinan Hengsi Shanda Instrument Co., Ltd.