What are the precautions for installing a salt water spray tester
Release time:2019-04-26 source:Jinan Hengsi Shanda Instrument Co., Ltd. Browse:
When you choose a salt water spray tester that meets the technical requirements and is within the budget from the entanglements of many brands, manufacturers and configurations, we need to start considering the preparation of the equipment placement site. Let me introduce to you what are the precautions for the installation of the salt water spray tester. For this equipment, three parts need to be prepared are water, electricity and gas.
Below we will focus on the following two aspects to make detailed explanations so that customers can install and debug as soon as possible after the equipment is accepted:
Things to note about water source installation site of salt water spray tester
1. Requirements for water quality: Industrial water or tap water can only be used after being filtered by a pure water device. It is recommended to use bottled water for daily drinking;
2. Requirements for water pressure: The water pressure is kept within the range of 1-3 kg to ensure normal water replenishment. The equipment of relevant manufacturers will install automatic water replenishment devices according to customer needs;
3. Interface requirements: The equipment water replenishment port and drain port must be connected by self-produced hose and fixed with a sealing ring to prevent leakage. The drain port can also be directly led to the outdoors.
Related precautions for laboratory power supply system of salt water spray tester
1. Install the power supply according to the equipment rated power and rated voltage provided by the test machine manufacturer. The capacitance of the missing switch meets the equipment requirements;
2. Do not use other electrical equipment with the power supply of this machine to prevent the normal use of the test machine from being affected by the short circuit of other equipment;
3. During installation, please connect the wires (yellow and green wires) of the test machine to the ground terminals so that the leakage switch can cut off the main power supply when the equipment leaks, thereby preventing people from getting electric shock. When wiring, be sure to note that the ground wire cannot be shared with other equipment.
Requirements for laboratory gas source of salt water spray tester
1. Pressure requirements: The air pressure of the air compressor or air supply pipe must be within the intake pressure range provided by the manufacturer;
2. Interface requirements: The pipeline needs to be connected with an inner diameter 8mm quick connector with easy disassembly and maintenance;
3. Time requirements: When the equipment is working normally, the gas source must be supplied for a long time and cannot be interrupted in the middle; the gas source must be cut off after the equipment test is completed.
The above three aspects are about what precautions are required for the installation of the salt water spray tester, which is sufficient to be a reference in the preparation work during the installation of the equipment. I hope it can help you. Friendly reminder: If you have any unclear areas, please call us for consultation.